AES Alacrity

CMAR Services::

 Office supply & IT technology
GSA Contract Number: GS-14F-0040K
contract period is September 20, 2000 - September 19, 2020
FSSI Contract:GS-02Q-14-D-CR0024 

 #1 Since 1996       Data center relocations, office relocations, workstation relocations

(888) 539-8440

International

44 20 3239 5695  U.K.

NYC:347-689-6939 DC:703-310-6420 TX:619-793-4681

CH: 312-224-8152 SF:415-518-0356

 





     
Home 
Contact
About 
Products 
Salvage
Publications
Rates 
Consultation 
Request Quote
Services
Special Services
FAQ 
Clients
Rational
Employment
Opportunities

 

AES : CMAR Services: Constuction Manager At Risk

 

AES Construction Manager at Risk (CMAR) is a contractual solution which entails a commitment by AES (Construction Manager (CM)) to deliver the project within a Guaranteed Maximum Price (GMP).  The contractual obligations are based on the construction documents and specifications at the time of the GMP plus any reasonably inferred items or tasks.

AES CMAR provides professional services and acts as a consultant to the owner in the design development and construction phases.

 AES CMAR services also provides some of the actual construction of the project depending on the availability of bidders and the expertise of AES. In addition to acting in the owner's interest, the AES CMAR  manages and controls construction costs to not exceed the GMP because contractually any costs exceeding the GMP, that are not change orders, are the financial liability of AES.

AES CMAR will give the Owner a GMP prior to bidding the project.   Included in this GMP is a contingency line item to take care of bid overages, reasonably inferred items and other project related items that may arise during construction. By giving the Owner the GMP prior to bids, the CMAR assumes the risk of bids coming in higher as he is contractually bound to deliver the project per the plans and specifications and any additional allowances as defined in his GMP.

Owner Benefits

AES CMAR provide several unique benefits to the client, including:

A higher level of cost control from the start. A successful CMAR project would involve hiring the AES CMAR prior to the systems or structural architect, and having the AES CMAR help select the architect. During the design process, AES CMAR provides cost estimates at contractually established points. If these cost estimates are in line with the established budget, the architect then moves on to the next phase of design. If not, the AES CMAR, client and Architect assess the cost estimate and make design changes to bring the design back into budget alignment.

This process ensures budget integrity and execution.

AES CMAR team acts as a client advocate and manages the project with the client’s best interest in mind at all times. The AES CMAR agreement takes burden off of the Owner in managing and coordinating the project.

The Owner’s risk is limited by the CMAR process providing the construction documents are complete and proper allowances and contingencies are built into the GMP.

Implementability or constructability and value to the Owner are afforded by the value engineering expertise brought to the process by the AES CMAR team.  Since AES is at risk and gives the GMP prior to bid, he does not have to select the low bid. Generally the thorough prequalification process minimizes the number of low bidders that get disqualified and generally leads to lower long term costs, higher quality, and fewer claims because only pre-qualified contractors are performing work. AESCMAR services are professional services like architectural, engineering, surveying, etc.

AES CMAR team’s main purpose is not to construct the project, but to manage the construction of the project. This management focus adds much value to the project. It is important to keep in mind that an adverse CMAR-Architect relationship can lead to some of the same issues that arise in a design-bid-build delivery method.

By having the CMAR help select the Architect, the risk of an adverse relationship is minimized. As with any delivery method, incomplete and/or inaccurate construction drawings will result in change orders. The misunderstanding associated with the GMP is that this maximum price will not be exceeded in any case. It is important to understand that the GMP is based on the plans and specifications at the time of the GMP with some reasonable assumptions made and a reasonable contingency included.

Major changes in scope will result in a change order, which increases the GMP contract. In addition, any client changes to the project and scope require a change order. By requiring the documents by 100% complete prior to receiving the GMP, the risk of unanticipated change orders are minimized.

For more information about AES CMAR services plese contact ; AESCMAR@alacrity-engineering-services.com

 

 

 

 